Select a team member to start chatting
Yalda Sheri
Senior Property Consultant
Typically replies within 1 hour
Junaid Nuzeebun
Property Development Specialist
Powered by WhatsApp
Residence Doyen is a 14-apartment address on Doyen Avenue in Quatre Bornes, close to Belle Rose and advertised at around 600 metres from both St Jean Road and Victoria Avenue. The homes are configured with three bedrooms and two bathrooms, an open-plan living and dining area, a contemporary kitchen and covered parking. Allys advertises apartment areas from 96 m² to 111 m². The exact area basis, plan and price should be checked for the selected residence. Building features advertised for the project include lift access, a backup generator and secure access through an electric gate. Structural work is reported complete, with internal finishing under way. Completion is estimated for 28 February 2027. As of 7 October 2026, 12 of the 14 apartments were advertised as available, with prices from MUR 7,450,000 excluding fees; both availability and completion timing remain subject to current sales and contract documents. The map pin marks an approximate Doyen Avenue project vicinity. It is not a surveyed parcel, building entrance or unit coordinate.
The Peninsula is a 40-residence waterfront address in Black River, arranged across eight blocks with 32 three-bedroom apartments and eight penthouses. ALLYS and the project team advertise terraces, direct beach access, a pool, sports centre and padel courts. Individual views, access rights, completion terms and purchaser eligibility remain subject to the selected residence and contract.
147 International is a seven-residence address near Tamarin Bay: six three-bedroom apartments and one penthouse. ALLYS describes a location roughly 60 metres from the beach and the penthouse with an expansive terrace and private pool. Completion is advertised for November 2027; actual availability and the terms of individual residences remain subject to current documentation.
West Bay is an 11-residence mixed-use address in La Preneuse: eight three-bedroom apartments and three four-bedroom penthouses above ground-floor commercial space. The developer advertises landscaped communal areas, secure parking and a rooftop swimming pool. Completion is advertised for 2028; unit-specific views, inclusions and availability must be confirmed in the current sales record.
River Edge is a five-home riverside development in Black River, comprising four three-bedroom apartments and one penthouse. ALLYS describes modern, landscaped surroundings, open-plan interiors, contemporary kitchens and private outdoor spaces; the penthouse is advertised at 236 m². Availability, construction timing and purchaser terms should be confirmed against the selected residence.
Coastal View 3 comprises 16 three-bedroom apartments across two blocks on Vingt Pieds Road, Grand Baie. The developer advertises 130 m² homes with European-standard kitchens, private balconies, landscaped communal areas, a shared pool and parking. Estimated completion is December 2026; roof-space inclusion, availability and pricing remain unit-specific.
Emara is a six-residence apartment address in Pereybere, with two three-bedroom homes per floor. The developer advertises open-plan interiors, European-standard kitchens, generous balconies and a rooftop infinity pool. Delivery is advertised for Q4 2026; shared facilities, availability and contract terms should be confirmed for the selected residence.
Amali is a 17-residence development in Tamarin: 14 apartments and three penthouses across three buildings. The current ALLYS record describes two- and three-bedroom homes, tropical landscaping and private outdoor spaces. Availability, shared facilities, views and purchaser eligibility should be confirmed against current project and unit documentation.
Le Loft is a limited eight-apartment development on Barkly Street in Beau Bassin–Rose Hill. Allys’ current unit cards describe a consistent three-bedroom, two-bathroom layout of 108 m², with open-plan living and dining areas, contemporary finishes and private outdoor space. The address is promoted for its access to Rose Hill, Ebène, metro and bus routes, shops, schools, banks and everyday amenities; actual routes and journey times should be checked for the selected residence. Allys’ project timeline gives a construction start in March 2026 and estimated completion in October 2027, while the page’s stage label still reads “Pre launch marketing”. These are advertised dates rather than a contractual delivery commitment. Buyers should confirm the current construction milestone, programme, parking allocation, specifications, title, fees and handover terms. On 20 October 2026, the individual unit cards on Allys’ official project page marked TF7 and TF8 “For Sale” at MUR 9,000,000 each and marked the other six apartments “Sold”. The same page’s headline summary still showed three available and a starting price of MUR 8,500,000, so the detailed unit cards were used for the current Collection snapshot. Availability and prices can change and must be reconfirmed with Allys. The GIS point is taken directly from the official Allys project-page data for Le Loft. It identifies the project on Barkly Street but is not a surveyed cadastral boundary, building entrance or unit-specific coordinate.
Bayside is a 15-residence waterfront development in Grand Baie, with 12 apartments and three penthouses. ALLYS advertises a direct connection to a natural bay and outlooks towards Coin de Mire. Exact access arrangements, sightlines, price and purchaser eligibility should be confirmed through current project and unit documentation.
Vantage brings 25 apartments together across three residential blocks in Beau Bassin. Block A contains 12 apartments, Block B six and Block C seven, with three-bedroom, two-bathroom layouts advertised across the development. Each home is described with a master suite, kitchen, living area and balcony. The published unit records show differing floor areas and ground-floor options, so the layout, outdoor space and exact specification should be checked for the apartment selected rather than assumed to be identical throughout. The project’s advertised shared facilities include a gym, landscaped communal areas and a relaxation area. Private and visitor parking, CCTV and 24-hour security are also listed. These are project-level specifications; allocated parking and the final facilities form part of the details to confirm before reserving. Construction is recorded as under way, with estimated completion in December 2026. That date is an estimate, not a delivery guarantee. Current stock, pricing and sale terms should be confirmed against the chosen unit.